 |
February 22, 2011:
Revised
and re-formatted.
“Table of Contents” added.
Page 1 re-written.
“Key Roles & Responsibilities”,
“Policy & Principles”, “Process Approach” and “Supplier
Development & Learning” pages deleted.
“Business Conduct” page deleted and
topic added into Page 1.
“Quality Objectives” page added.
“Quality Management System
Requirements” page deleted and topic added as Paragraph
3.1 into “Dana Specific Requirements” section.
“Dana Specific Requirements”
section re-written.
Paragraph
headings/paragraphs removed –
Introduction, 1, 1.1, 1.2, 2, 3, 3.1, 4, 4.1, 4.1.1,
4.2, 4.2.1, 4.2.3, 4.2.4, 5, 5.1,
5.1.1, 5.2, 5.3, 5.4, 5.4.1, 5.4.1.1,5.4.2, 5.5, 5.5.1,
5.5.1.1, 5.5.2, 5.5.2.1, 5.5.3, 5.6, 5.6.1, 5.6.1.1,
5.6.2, 5.6.2.1, 5.6.3, 6, 6.1, 6.2, 6.2.1, 6.2.2,
6.2.2.1, 6.2.2.2, 6.2.2.3, 6.2.2.4, 6.3, 6.3.1, 6.4,
6.4.1, 6.4.2, 7, 7.1, 7.1.1, 7.1.2, 7.1.3, 7.2, 7.2.1,
7.2.2.1, 7.2.2.2, 7.2.3, 7.2.3.1, 7.3, 7.3.1, 7.3.1.1,
7.3.2, 7.3.2.1, 7.3.2.2, 7.3.3, 7.3.3.1, 7.3.3.2, 7.3.4,
7.3.4.1, 7.3.5, 7.3.6, 7.3.6.1, 7.3.6.2, 7.4, 7.4.1,
7.4.1.1, 7.4.1.2, 7.5, 7.5.1, 7.5.1.1, 7.5.1.2, 7.5.1.3,
7.5.1.4, 7.5.1.5, 7.5.1.6, 7.5.1.7, 7.5.1.8, 7.5.2.1,
7.5.3, 7.5.3.1, 7.5.4.1, 7.5.5, 7.5.5.1, 7.6, 7.6.1,
7.6.2, 7.6.3, 7.6.3.1, 7.6.3.2, 8, *.1, *.1.1, 8.1.2,
8.2, 8.2.1, 8.2.1.1, 8.2.2, 8.2.2.1, 8.2.2.2, 8.2.2.3,
8.2.2.4, 8.2.2.5, 8.2.3, 8.2.3.1, 8.2.4, 8.2.4.1,
8.2.4.2, 8.3, 8.3.1, 8.3.2, 8.3.3, 8.3.4, 8.4, 8.4.1,
8.5, 8.5.1, 8.5.1.1, 8.5.1.2, 8.5.2, 8.5.2.1, 8.5.2.2,
8.5.2.3, 8.5.2.4, 8.5.3.
Paragraphs
revised, re-numbered and or added –
3.2
Supplier Quality Manual was 4.2.2 Quality Manual.
3.3
Engineering Specifications was 4.2.3.1 Engineering
Specifications.
3.4 Record
Retention was 4.2.4.1 Record Retention.
6.3.2
Contingency Plans deleted and item added to “Quality
Objectives”.
3.5
Special Characteristics was 7.2.1.1 Customer-designated
special characteristics; 7.2.2 Review of Requirements
Related to Product & 7.3.2.3 Special Characteristics.
3.6
Production Part Approval Process (PPAP) was 7.3.6.3
Product Approval Process.
7.3.7
Control of Design and Development Changes incorporated
into the new “Change Management” section.
3.6
Production Part Approval Process (PPAP) (packaging
requirements portion) was 7.5.4 Customer Property
(packaging requirements portion).
3.7
Periodic Production Part / Process Validation was 7.5.2
Validation of Processes for Production and Service
Provision.
3.8
Approved / Designated Sources was 7.4.1.3 Customer
Approved Sources; 7.4.2 Purchasing Information; 7.4.3
Verification of Purchased Product & 7.4.3.1 Incoming
Product Quality.
3.9
Sub-Tier Supply Chain Control was 7.4.3.2 Supplier
Monitoring.
3.10
Supply Capacity added.
3.11 Dana
Owned Tooling and Equipment was 7.5.4 Customer Property
(Dana owned tooling and equipment portion).
3.12
Global Casting Requirements was Supplemental, Global
Casting Requirements, Dana Specific Casting Quality
Requirements.
Annex A (
normative ) Control Plan deleted.
“Supplier
Systems Assessment” and “Process Series Review” pages
deleted and replaced by the “Supplier Assessment
Processes” section.
“Supplier
Advance Product Quality Planning (APQP)” was “Supplier
APQP” – section re-written and re-formatted.
“Non-conforming Material” was “Corrective Action” –
section re-written and re-formatted.
|