Restricted
Shipping Level I
Description:
Restricted Shipping Level I is a requirement by Dana
that a supplier put in place an additional 100%
containment process at the supplying location to contain
for specific and or specified nonconformances. The
Supplier Must implement a root-cause problem
solving process, and isolate Dana from the receipt of
nonconforming parts/material. The additional 100%
containment is in addition to all normal controls. It
is enacted by the supplier’s employees, and must be in
addition to the normal production process controls.
Additional Description:
The data obtained from the additional 100% containment
process is critical as both a measure of the
effectiveness of the primary containment process and the
corrective actions taken to eliminate the initial
nonconformance.
Criteria for Application
(any of the items below may be considered):
•
All nonconformance
•
Supplier’s current controls are not sufficient to ensure
conformance to requirements
Deliverables:
•
Certified Material to the Dana facility
•
Problem Resolution Workbook to demonstrate effective
root cause analysis and effective containment
(nonconforming vs. quantity checked)
•
Documented and verified Corrective Action
•
Additional process controls (poka-yoke) to prevent
future occurrences
•
Revised Process Flows, PCPs, PFMEA, Standardized work
instructions as required
•
Restricted Shipping Level I Entry letter
•
Restricted Shipping Confirmation Reply Form
•
Completion of all requirements within the Dana SCAR
system
•
Restricted Shipping Level I Exit Letter
|
Necessary Inputs: |
|
Source of Input: |
|
Corrective Action Request (CAR, SCAR, DMR, & NCMR)
|
|
Mfg/Assembly Plants |
|
Request for entry into Level I |
|
Mfg./Assembly Plants/SQE |
Resources:
Dana
Facility Quality/Reliability Department, Dana Supplier
Quality Engineer, Buyer, and supplier
Methodology:
Assessment Phase
-
Dana
Manufacturing/Assembly Plants or SQE initiate Restricted
Level I, referencing the nonconformances or observations
that the Supplier’s current controls are not sufficient
to ensure conformance to requirements.
Entry/ Implementation Phase
•
Initiator notifies the supplier (staff level) they are
being placed in Restricted Shipping Level I
.•
Initiator sends formal confirmation to the supplier via
a Restricted Shipping Level I Entry letter, addressed to
the supplier’s Top Management.
•
Initiator contacts the supplier (via conference call or
meeting) to:
-
Review the non-conformance that resulted in the Level I
entry.
-
Review and approve the supplier’s containment process
which includes:
o
Data
collection utilizing an I-chart.
o
Communication back to Dana (including frequency).
o
Control of non-conforming product.
-
Review and approve the supplier’s escalation/reaction
plan for the containment activity.
-
Establish boundary samples and/or specifications for
acceptance/rejection of the parts.
-
Establish exit criteria for the Level I. Default
criteria as follows:
o
30
working days of data (from the date of
implementation of permanent corrective action)
which verifies that the normal production controls are
effective for controlling the discrepancies identified
in the Restricted Shipping activity.
o
Documentation showing the root cause was identified and
verified.
o
Documentation indicating the level of error proofing
implemented.
o
Copies of all documentation revised as required (Control
plan, FMEA’s, Process Flow, operator instructions, etc.)
o
Documentation indicating that every effort was taken to
implement error proofing.
•
Initiator requests the support of the Dana Supplier
Development if the supplier is uncooperative in
implementing Level to our requirements.
•
Supplier does the following:
-
Ensure understanding of the nonconformance.
-
Return confirmation letter as required.
-
Develop an escalation/action plan.
-
Immediately establish a separate containment activity
area at their location that is acceptable to Dana.
-
Notify additional Dana Plants that use the same part,
inform them of the nonconformance, and provide
containment activities as necessary.
-
Track breakpoints of nonconforming material. (Purge
pipeline of suspect material, i.e. at Dana’s facility,
in transit and at all storage locations.)
-
Mark
individual parts, material, and containers, as agreed
upon by Dana, to identify parts certified for
production.
-
Provide proper layout and instruction documents, space
and tooling to perform Restricted Shipping - Level I.
-
Commence the containment activities and display the
results in a public and visible location.
•
Supplier Development does the following:
-
If
requested, intervene to support the initiator if the
supplier is uncooperative in implementing Level I per
Dana’s requirements.
-
Notify Purchasing Manager if commercial intervention is
required.
Monitor and Check Phase
•
Supplier does the following:
-
Perform an additional 100% containment of all suspect
non-conforming products per the agreed upon process and
ensure defect free parts/material are delivered to Dana.
-
Process in a timely manner the corrective actions
requested by Dana.
-
Update all applicable documentation, (i.e. Process
Control Plan, PFMEA, Flow Diagram, and Standardized work
Instructions etc).
-
Document containment data in I-chart format.
•
Initiator does the following:
-
Monitor supplier’s containment data (I-chart.)
-
Verify the supplier root cause and corrective action.
-
Verify the supplier updated all applicable documented
documentation (i.e. Process Control Plan, PFMEA, Flow
Diagram, and Standardized work Instructions etc).
Verification for Exit
•
Supplier does the following:
-
Meet
the defined exit criteria.
-
Requests exit from Restricted Shipping Level I and
provide supporting documentation and assessments on
performance and corrective actions to the appropriate
Dana representative.
•
Initiator does the following:
-
Verify that the supplier has met all exit criteria. The
Supplier is removed from Level I after all exit criteria
are met and the established time has expired without
further nonconformances at the Dana Assembly
/Manufacturing Facility, or coming out of the Supplier’s
process.
-
Notify the supplier verbally that they have met the
criteria and that they will be removed from Level 1 upon
receipt of the Level 1 exit letter.
-
Issue a Restricted Shipping Level 1 Exit letter to the
supplier for official notification that they have met
the exit criteria.
Initiator Responsibility:
-
Confirm supplier’s non-conformance and reviews their
quality performance.
-
Verbally notify the supplier’s management of the
non-conformance and entry into Level 1.
-
Communicate Level 1 requirements to the supplier
(including exit criteria.) via conference call or
meeting.
-
Complete appropriate documentation for formal
notification to the supplier.
-
Verify and approve supplier’s Restricted Shipping
plan/process.
-
Monitor supplier’s containment data (I-chart).
-
Verify supplier’s root cause analysis and corrective
actions.
-
Verify the supplier’s process control improvements and
validation plan/frequency.
-
Verbally notify the supplier’s management of their
removal from Level 1.
-
Complete appropriate documentation for formal
notification of removal from Level 1.
Supplier Development Responsibility:
-
• If
requested, intervene to support the initiator if the
supplier is uncooperative in implementing Level 1 per
Dana’s requirements.
-
Notify Commodity Manager if intervention is required.
Supplier Responsibility:
-
Ensure understanding of the nonconformance.
-
Return confirmation letter as required.
-
Develop an escalation / action plan.
-
Implement a Level I containment activity to ensure
defect free parts/material are properly identified and
delivered to Dana.
-
Notify additional Dana Plants that use the same part and
inform them of the nonconformance.
-
Purge pipeline of suspect material.
-
Determine root cause.
-
Develop, implement, and validate permanent corrective
actions and process controls.
-
Update all applicable documents.
-
Document containment data in I-chart format.
-
Communicate action plans, containment status, and
results of problem resolution activities to Dana in a
format and with a frequency agreed to by the Dana
representative.
-
Meet
the defined exit criteria.
-
Request exit from Restricted Shipping - Level I with
appropriate supporting documentation.
Restricted Shipping Level II
Description:
Restricted Shipping Level II)(Description:) Restricted
Shipping Level II is a Dana requirement of a supplier to
put in place a certified 3rd party containment process
to contain for a specific nonconformance, while
implementing a root cause and corrective action problem
solving process. (Root Cause and Corrective Action
must be verified by 3rd Party Quality
Engineering)The additional containment is over and
above the normal controls as well as Restricted Shipping
Level 1 containment activities.
Additional Description:
The 3rd party or a Dana representative will perform
assessment audits. The data obtained from the 3rd party
additional containment process as well as the audits are
critical as both a measure of the effectiveness of the
secondary containment process and the corrective actions
taken to eliminate the initial nonconformance.
Criteria for Application
(any of the items below may be considered):
-
Repeat CAR, SCAR, DMR,& NCMR's
-
Duration, quantity, and/or severity of the problem
-
Restricted Shipping Level I failures
-
Major Disruptions
-
Quality Problem (i.e. Pass through defects, Customer
complaints, Warranty, etc..)
Deliverables:
-
Certified Material to Assembly Plant
-
I-Chart to demonstrate product quality (nonconforming
vs. quantity checked by a 3rd party)
-
Documented and verified corrective action
-
Revised PCP’s, PMEA, Operator Instructions as required
-
Restricted Shipping Level II Entry Letter
-
Restricted Shipping Confirmation Reply Form
-
Restricted Shipping Level II Exit Letter
|
Necessary Inputs: |
|
Source of Input: |
|
Corrective Action Request (CAR, SCAR, DMR, & NCMR)
|
|
Mfg/Assembly Plants |
|
Request for entry into Level II |
|
Mfg./Assembly Plants/SQE |
Resources:
Dana Plant Quality/Reliability Department, Dana Supplier
Quality Engineer, Buyer, supplier, and 3rd Party
Provider
Methodology:
Assessment Phase:
-
Dana
Manufacturing/Assembly Plants or SQE initiates
Restricted Shipping Level II, referencing the
non-conformance observations at the supplier, the
supplier’s internal /external data, or other criteria
for application.
-
Re-implementation of Restricted Shipping Level II due to
a repeat nonconformance that requires 3rd Party Register
notification, the initiator will obtain the concurrence
of the Dana Supplier Development Group prior to
notifying 3rd Party Register.
Entry/Implementation Phase:
•
The initiator verbally notifies the supplier that:
-
They
are being placed on Restricted Shipping Level II.
-
Containment must be initiated immediately, in order to
protect Dana.
-
Entry letter will follow.
-
Supplier must contract an authorized 3rd party Level II
Provider.
-
Initiator will be holding a kickoff meeting/conference
call.
•
Initiator/SQE sends formal confirmation to the supplier
via a Restricted Shipping Level II Entry letter,
addressed to the supplier’s Top Management.
•
Initiator/SQE and the Supplier agree on 3rd party
provider.
•
Supplier contacts a Restricted Shipping 3rd party and
issues a purchase order for Restricted Shipping Level II
activities within 24 hours of receiving the Level II
letter.
•
Supplier returns confirmation letter.
•
Initiator/SQE and 3rd party provider hold a kickoff
meeting or conference call with the Supplier’s Quality
Manager and Plant Manager to:
-
Review the non-conformance that resulted in the Level II
entry.
-
Review and approve the supplier’s containment process
which includes:
o
Data
collection utilizing an I-chart
o
Communication back to Dana (including frequency)
o
Control of non-conforming product
-
Review 3rd party provider actions/assessments as
required.
-
Review and approve the supplier’s escalation/reaction
plan for the containment activity.
-
Establish boundary samples and/or specifications for
acceptance/rejection of the parts.
-
Establish exit criteria for Level II.
•
Supplier performs an additional containment of all
suspect nonconforming products per the agreed upon
process to ensure defect free parts (Level I).
•
Supplier notifies additional Dana Plants that use the
same part, informs them of the nonconformance, and
provides containment activities as necessary.
•
The 3rd Party Provider performs a 2nd
additional containment of all suspect non-conforming
products per the agreed upon process to ensure defect
free parts are delivered to Dana.
•
3rd party Provider Quality Engineer and the Dana SQE
reviews the Supplier’s process and quality history. The
3rd party Provider completes the Assessment.
•
Initiator/SQE requests the support of the Dana buyer if
the supplier is uncooperative in implementing Level II
and or supplying a PO number for 3rd party provider to
Dana’s requirements.
•
Supplier submits irreversible corrective action plans to
the ISO 9001:2000/TS16949
registrar for review and/or assessment and authorizes
ISO 9001:2000/TS16949 registrar to submit the review
and/or assessment findings to Dana.
•
Buyer does the following:
-
If
requested, intervene to support the SQE if the supplier
is uncooperative in implementing Level II and/or
supplying a P/O# for 3rd party provider per Dana’s
requirements.
-
Notify Commodity Manager if intervention is required.
Monitor and Check Phase:
•
Supplier does the following:
-
Perform an additional containment of all suspect
non-conforming products per the agreed upon process and
ensure defect free parts/material are delivered to Dana.
(Restricted Shipping Level I Requirements)
-
Contracts a 3rd Party Provider, acceptable to Dana
Limited, who performs an additional containment process
of all suspect non-conforming products per the agreed
upon process to ensure defect free parts are delivered
to Dana. The supplier is responsible for all costs of
the Controlled Shipping third party for the activity.
-
Determine and demonstrate the root cause to Dana
Initiator/SQE
-
Develop, implement and validate the permanent corrective
actions, along with improved process controls (i.e.,
error proofing, layered audits, setup checklists,
standardized work, operator training and certification
program, etc.)
-
Document containment data in I-chart format.
-
Implement lessons learned.
-
Update all applicable documentation, (i.e. Process
Control Plan, PFMEA, Flow Diagram, and Standardized work
Instructions etc.)
-
Communicate the action plan, containment status, and
results of problem resolution activities to Dana in a
format and with a frequency agreed to by the Dana
representative.
•
Initiator does the following:
-
Monitor supplier’s containment data (I-chart).
-
Verify the supplier has a documented process control
validation program in place (such as job setups, setup
error proofing, process error proofing, layered
auditing, operator training & certification etc.)
-
Verify supplier’s root cause analysis and corrective
actions.
Verification for Exit:
•
Supplier does the following:
-
Meet
the defined exit criteria.
Obtains 3rd Party Validation of
proposed corrective action
-
Requests exit from Restricted Shipping - Level II and
provide supporting documentation and assessments on
performance and corrective actions to the appropriate
Dana representative. (Dana plant representative will be
notified if required.)
•
Initiator does the following:
-
Verify that the supplier has met all exit criteria. (May
be performed by the 3rd party.) The Supplier is removed
from Level II after all exit criteria are met and the
established time has expired without further
non-conformances at the Dana Assembly /Manufacturing
Plant or coming out of the Supplier’s process.
-
Notify the supplier verbally that they have met the
criteria and that they will be removed from Level II
upon receipt of the Level II exit letter.
-
Issue a Level II exit letter to the supplier for
official notification that they have met the exit
criteria.
Initiator Responsibility:
•
Confirm supplier’s non-conformance and review their
quality performance.
•
Verbally notify the supplier’s management of the
non-conformance and entry into Level II.
•
Verify and approve supplier’s 3rd party provider
selection.
•
Hold kickoff meeting with 3rd party provider and
supplier as specified in the Entry/Implementation phase.
•
Complete appropriate documentation for formal
notification to the supplier.
•
Verify and approve supplier’s Restricted Shipping
plan/process.
•
Monitor supplier’s containment data (I-chart).
•
Verify supplier’s root cause analysis and corrective
actions.
•
Verify the supplier’s process control improvements and
validation plan/frequency.
•
Verbally notify the supplier’s management of their
removal from Level II.
•
Complete and distribute the appropriate documentation
for formal notification of removal from Level II.
Supplier Responsibility
•
Ensure understanding of the nonconformance.
•
Develop an escalation / action plan.
•
Contact and issue a purchase order to the Restricted
Shipping 3rd party for Controlled Shipping
-
Level II activities. The supplier is responsible for all
costs of the Controlled Shipping third party for the
activity.
•
Return confirmation letter.
•
Implement a Level II containment activity to ensure
defect free parts/material are properly identified and
delivered to Dana.
•
Purge pipeline of suspect material.
•
Notify additional Dana Plants that use the same part and
inform them of the nonconformance.
•
Submits irreversible corrective action plans to the ISO
9001:2000/TS16949 registrar for review and/or assessment
and authorizes ISO 9001:2000/TS16949 registrar to submit
the review and/or assessment findings to Dana.
•
Authorize ISO 9001:2000/TS16949 registrar to submit the
review and/or assessment findings to the Dana.
•
Determine root cause.
•
Develop, implement, and validate permanent corrective
actions and process controls.
•
Update all applicable documents.
•
Document containment data in I-chart format.
•
Communicate action plans, containment status, and
results of problem resolution activities to Dana in a
format and with a frequency agreed to by the Dana
representative.
•
Satisfy all additional requests noted on the Level II
Entry Letter and/or communicated during the Kick off
meeting.
•
Meet the defined exit criteria.
•
Request exit from Restricted Shipping - Level II with
appropriate supporting documentation.
Buyer Responsibility:
•
Intervene to support the Initiator/SQE if the supplier
is uncooperative in implementing Level II per Dana’s
requirements.
•
Notify Commodity Manager if intervention is required.
3rd Party Responsibility:
•
Participate/Lead the Level II Kick off meeting.
•
Supply the required/agreed upon resources to perform the
Level II activity.
•
Perform Level II activity as contracted.
•
Set up and verify conformance for all Level II activity.
•
Supply containment results (I-chart) as
required/requested.
•
Verification that the Supplier’s Root Cause, Corrective
Actions, Process Controls, Process Documentation is
updated and complete. (Verify adequate completion of the
problem resolution workbook
•
Supply required documentation to the Dana Initiator/SQE
to meet the Level II requirements (as applicable).
V1.6
Restricted
Shipping Level II
|